One of the world's top six petrochemical companies had a problematic flexible connection that other products and suppliers could not resolve.
The process was the manufacturing of sliced polycarbonate chips which are extremely abrasive.
The connector, situated in a difficult location between the separator and the cyclone, was only lasting between two and five days.